Sample · adapt to the contract

Define what “tested” means before the robot is built.

This generic checklist is not sufficient for every robot or regulated application. A project-specific protocol should follow the signed specification and risk assessment.

Sample record · CRS-FAT-DEMOTemplate only
A

Identity

Model, serial, configuration, software, accessories and labels.

B

Condition

Assembly, finish, damage, connectors, wheels, joints and packaging.

C

Safety controls

Emergency stop, limits, alarms, manual modes and recovery.

D

Core function

Motion, charging, sensors, navigation or task sequence.

E

Interfaces

API, network, doors, elevators, fleet or tool integration.

F

Release

Deviations, correction, re-test, documents and packing evidence.

Release rule

Each check records unit identity, method, expected result, actual result, evidence link, deviation and disposition. A “pass” applies only to the tested scope and date.